|
ClearLine Profiler Newly Laid Pipe Case
Studies
PVC and HDPE
36inch HDPE Pipe Louisville USA
Overview: This initial profiling in Kentucky was conducted to
ascertain ovality levels of this corrugated polyethylene
pipe with internal lining one year after being laid.
Following the results of this profiling an ‘Evaluation of
HDPE Pipe Performance of Kentucky DOT
Construction Projects’ was undertaken to evaluate
current specification and the use of HDPE pipe on
future DOT (Department of Transport) projects. Further
information on this study is provided later in this
document.
225mm PVC Pipe Rodney NZ
Overview:
This is a standard stormwater pre-adoption profile
inspection.

Please note that
all these case studies require Adobe
Acrobat to view.
|